Installation Guide

Arlington Aluminum Railing Installation Guide
We’re happy to help. Call 1-855-224-9761.
2
Straight Railing Installation
Step 1: Measure & Locate All Posts
1.
Measure and locate all posts.
2.
Choose the appropriate 3/8 in. fasteners to fasten the posts according to local
regulations. Ensure the posts are plumb. Use shims to adjust verticality.
Note: The internal spacing between 2 posts is 6‘ and 8' or less than 6' or 8'.
6' or 8'
or less than 6' or 8'
Shims