Owner`s manual
21
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com
Tools Needed:
INSTALLATION
13
Vertical Track
3/16” Drill Bit
Power Drill
7/16” Socket
Driver
Tape Measure
Level
BOTTOM SECTION
5/16 X 1-5/8”
LAG SCREWS
FLAGANGLE
VERTICAL
TRACK
ASSEMBLY
JAMB
BRACKET
IMPORTANT: THE TOPS OF THE
VERTICAL TRACKS MUST BE LEVEL
FROM SIDE TO SIDE. IF THE BOTTOM
SECTION WAS SHIMMED TO LEVEL IT.
THE VERTICAL TRACK ON THE SHIMMED
SIDE, MUST BE RAISED THE HEIGHT OF
THE SHIM.
Position the left hand vertical track
assembly over the rollers of the bottom
section. Make sure the counterbalance
cable is located between the rollers and
the door jamb. Drill 3/16” pilot holes for
the lag screws.
Install the track so that it is aligned with
the bottom of the door.
Secure jamb brackets and flagangles
to the jamb using 5/16 x 1-5/8” lag
screws. Hang counterbalance cable over
flagangle. Repeat for the right side.
BOTTOM SECTION
VERTICAL TRACK
ROLLER
5/8”
FULLY ADJUSTABLE FLAGANGLE
LAG
SCREW
LOCATIONS
5/16” X 1-5/8”
LAG SCREW
JAMB BRACKET










