User's Manual
QC Guide of Active Hub
Jul. 13
15
CDU/SDU SCANNER
7- SEND OK MESSAGE
8- SEND TEST MESSAGE
9- SEND BLANK MESSAGE
Press button “3”. Following message will appear:
Now press “5” to use CDU/SDU to test Acive Hub on Display network, following message will appear.
If ‘7’ is pressed a message ‘OK’ will appear on all connected Displays.
If ‘8’ is pressed a message ‘TEST’ will appear on all connected Displays.
If ‘0’ is pressed all the Displays will get BLANK.
In the same manner check all RJ45 Ports of Active Hub, by connecting the CDU’s to next four ports and send the
message one by one.
NETWORK SCANNER
1. TSU
2. TDU
5.CDU/SDU
PRESS DESIRED NUMBER
Welcome to TSU setup
3 3)Network Scanner
4 4)To Program TSU