Specifications

VärmeKabelTeknik Switchpointheating
11
Functiontestsandfaultdetection
Checkingthefunctionoftheswitchpointheating
elements
Theswitchpointheatingelementsaremadeoutof
doubleinsulatedselflimitingheatingcablewithan
outputpowerof100W/mat+10°C‐230Vac160
170W/mat–15°C.
Thistypefheatingelementhasacoreofdipped
fluoretheneplastic
whichhastheeffectthatits
resistanceincreaseswhenthetemperaturerises.
Thispropertyallowstheelementstoautomaticallysave
energywhentheweatheriswarm.Italsomeansthat,in
coldweathertherewillbeanextraamountofheat
added.
Resistancemeasuringofselflimitingelementsisnot
possibleastheresistancevaluereadingdoesnotshowa
valuecorrespondingtothepoweroutput.
Elementtestsaretobeconducted,withvoltage
switchedon,throughmeasuringthecurrentafterabout
15minutes’operation.Thecurrenthasthenstabilized
andcanbecomparedwiththevaluethatwasmeasured
when
theelementwasinstalled.Itshouldbenoted,
however,thatiftestingisdoneinthesummer,thenthe
currentvaluewillbelowerthaninthewinter.Ifthe
currentislessthan0,2A,theelementshouldbe
considereddefective.
99percentofanyvoltageleakagesor
directshort
circuitsderivefromfeedercablesorjunctionboxes.The
elementplugscanbeeasilydisconnectedfromthe
distributionboxwhenmeasuring.
Theconnectionblocksmountedonthetracksleeper
areofrubberandcastinonepieceandsocannotcause
ashortcircuit.Aconnectionblock’sterminalsare
fedby
separateconductorsviaan8polecablecastintegral
withtheblock.Currenttestscanthusbeconveniently
carriedoutoneachelement,offtrack,inajointboxin
thecableduct.
Theelementsaredoubleinsulatedandlackprotective
earthing.However,theinsulationresistancebetween
element
andrailmaybetestedbyjoiningthetwopins
oftheplugtoeachotherandthenconnectingthem
jointlytooneoftheterminalsoftheinsulationtester,
theotherterminalbeingconnectedtotherail.
Whenconductingsuchtests,youmustmakesurethat
youdonotcause
anysignallingerrors.