Instruction manual
15
Tests Common To All Models - Menu 1
Earthed Appliance Test (refer to TnT)
Double Insulation Test (refer to TnT)
Ext Lead Test (refer to TnT)
Power Test - Menu 2
The Power Test is for the purposes of monitoring and performance testing the DUT up to the current value 10Amps.
Please Note: A visual inspection test must be carried out before any others (refer to First Test Section)
The Power TEST completes the following sequence as part of its comprehensive testing procedure:
1. Integrated Supply Mains Test
Refer to Integrated Test section
2. Power Test
Procedure:
1. Complete a Visual Inspection on the DUI (Device Under Test). For details refer to the First Test section. If the DUT
passed the Visual Inspection, continue with the following instructions, if not, refer to the First Test section.
2. Plug male end of DUT into TnT Appliance socket
3. Press F1 to start the power test
4. If the appliance is safe to test press F3 on safety warning message. The DUT will power on.
5. Read and record results appropriately
6. Once the appliance has powered down and the test is complete. Unplug the DUT
7. Press Enter to return to the main menu
This test is Ideal for service agents and electricians. The User can plug in the appliance and turn it on with real time
measurements displayed on the display. This is useful when testing a DUT with a compliance/name plate on it. The operator
can compare the name plate details of operating voltage, operating current, and power factor etc. should the appliance exceed
the said values on the name plate it could be deemed faulty and require service.
Please note: Because the power test is not required in the electrical testing standards there is no pass / fail value in the TnT+. It
is up to the user to determine if the item is a pass or a fail based on the compliance/name plate on the DUT. If the test is
performed VIA WinPATS a pass fail value can be set during the test.
If the result was a pass - Tag the DUT with the appropriate tag including "next test due" date and "return to service".
If the result was a fail - Tag the DUT wit a danger tag and remove the DUT from service.
To select the second menu, press and release the Return/Enter Button.
This menu will display 3 functions:
Power Test
Leakage Test
RCD Test
The Power Test allows the user to turn the appliance on and measure its performance as a digital wattmeter. Displayed
parameters are:
Volts AC
Current
Volt Amp
Power Factor
Watts