User's Manual

Table Of Contents
SPEEDLAN 4100 & 4200 Installation and Operation User Guide
Quick Start 2-3
24" proprietary pigtail cable
*Grounding clamps
*Ethernet surge protector
*Wire zip ties
*Antenna (specialized upon request)
* Note:
Items can be purchased separately or as part of an Installation Kit.
Installation Steps
Some installation instructions are specific to customers who purchased Installation Kits from Wave
Wireless. To view a diagram of the installation listed below, see Installation Diagram, page 2-8.
The directions below contain installation procedures for the items included in the SPEEDLAN 4100 &
4200 antenna (and amplifier) kit. If you do not have an item included in the instructions below,
contact Wave Wireless.
If you are having trouble and need a full site installation, contact Wave Wireless Networking for
services and fees.
To install the SPEEDLAN 4100 & 4200, do the following:
Step 1.Verifying Line-of-Sight
Before installing the antennas and brouters, make sure a clear line-of-sight exists. Line-of-sight can
be defined as each antenna clearly seeing the other antenna, and seeing the remote locations when
viewing from the central base location. Be sure to look level with the center of origin of the
transmission (i.e., the middle of the antenna). Repeat this procedure from the remote location. Any
disruption of the signal path due to trees, building, or any other obstructions may cause the link to
function incorrectly. If you see any obstructions between two antennas, move one or both antennas
to another location.
TIP