User Manual
Version 3.03 SPEEDLAN 9000 Series Installation and Operation User Guide
2-16 SPEEDLAN 9101, 9102, 9103 & 9104 Hardware
• V-bolt kit which includes the following
• Bolt, V, Tower Mount, Stainless Steel (U-bolt) (quantity 2)
• Nut, 1/4"-20, Serrated Flange, Stainless Steel (quantity 4)
• V-Bracket, Tower Mount, Stainless Steel (quantity 2)
• Power supply
The following items are included with the installation kit, which can be purchased
separately:
• Hardware ties
• Lightning arrestor
• Electrical tape
• Waterproof putty tape
• Specialized CAT5 cable
• 10’ RF cable
• Grounding rod clamps
*Note: Antenna for the SPEEDLAN 9102 or 9103 can be purchased separately.
Customer Sourced / Other
• Combination wrench or socket wrench (7/16") to tighten the nuts on the V-
bolts (customer sourced only)
• Other tool accessories that can be purchased separately from Wave Wireless
are: cable, connectors, crimpers, spectrum analyzer, shrink wrap, APC
10BaseT putty, aluminum 2" pole, extendable mast, ballast mount, peak roof
mount, extra v-bolts, nuts, grounding rod clamps, wall mounts
Installation Steps for the SPEEDLAN 9102 and 9103
Both SPEEDLAN 9102 and 9103 routers follow the same general installation steps.
Some installation instructions are specific to customers who purchased Installation Kits
from Wave Wireless. To view a diagram of the installation listed below, see Figure 2-13
on page 2-22.
If you are having trouble and need a full site installation, contact Wave Wireless
Networking for services and fees.