Installation Guide
Optional hardware depending on the type of connection
● Bus connection cable: 2 wires, 24 AWG, minimum section: 0.22 mm² + braid
● Ethernet cables
● Ethernet switch
● Echelon U60 FT DIN USB Gateway (for LON FT10)
● High-gain GSM antenna
● High-gain LoRa antenna
● GSM or LoRa antenna cable
● Double-sided high performance adhesive tape
● Technical documentation of equipment
● Technical documentation of IoT sensors
● Schematic of the communication network(s) of the BMS
Computer access to the Wattsense console
● Each customer has a dedicated space on the Wattsense User Console at
https://console.wattsense.com. This interface allows them to manage their fleet of Boxes.
● A Box must have been activated in advance before it can be fully installed and configured.
● If the Box hasn’t been activated, ask the administrator of the account to create an
"installation" access on the Wattsense user console and retrieve the login information
(email address and password).
● Once on-site, activate the Box on the console:
○ Log in to the console: enter the email and password provided by the administrator
and click on "Log in".
○ Enter the alphanumeric identifier of the Box in the search rectangle at the top.
○ Click on "Activate".
○ It is required to give the Box a name in the "Name" field (for example, the name of
the site where it will be installed).
○ If necessary, add additional information in the "Description" field in order to clearly
identify the Box (for example the floor or the exact location of where the Box is
installed if there are several Boxes on the same site).
○ Click on "Activate the Box".
● You can then access the configuration tools.
2022-04-V1.3-EN 14