Installation Instructions

5
3.) After identifying the correct scored cutout line, use a reciprocating saw to
create a U-shaped opening in the basin that matches the connecting
channel. When the cutout is correctly removed, the channel tongue should
slide inside the hole in the basin, with the channel ange ush against the
basin’s exterior wall.
Corner/Tee Section Installation
1.) Note whether the connecting channel has a tongue or groove connection.
Identify the correct cutout pattern on the adjoining corner/tee section.
2.) Use a reciprocating saw to remove the cutout on the corner/tee. When
correctly removed, the channel tongue should slide inside the mating
groove on the corner/tee so the anges are ush.
3.) For corner connections, install a male end cap on the unused opening of
the corner/tee section.
Note: Corner/Tee sections will only mate properly with the downstream
end of a #5 channel section, or a neutral channel section.
Piped Corners
1.) Install the appropriate male or female end cap on each of the adjoining
sections.
2.) The end cap connections are No Hub. Install a suitable 90 degree coupling
or ttings (by others) to make a subsurface connection between the two
end caps.
3.) Open the end caps with a hole or reciprocating saw and make the connections.
FIG. F
Corner/Tee Section
Standard Section
End Cap
Standard Section
Flow
Flow
FIG. G
Corner/Tee Section
Standard Section
End Cap
Standard Section
Flow
Flow