Troubleshooting guide

Page 13
System Maintenance Continued...
Items needed:
Annual Maintenance
Stage 1 - Sediment Filter (part #: 104017)
Stage 2 & 3 - Carbon Block Filter (part #: 101009)
Stage 6 - Final In-line Filter (part #: 100014)
Step 1
Note:
Sanitizing of unit is recommended.
Perform steps 1 through 5 in the Six Month System Maintenance (Page 12).
Note:
If not sanitizing the system skip to step 8.
Step 3
Step 4
Step 5
Step 6
Remove the RO membranes from their housings and rest them in a clean sanitary place. (Refer
to “Membrane Replacement” section on page 14 for directions on removing the membranes).
Replace cap onto empty membrane housings and re-connect white tubing.
Step 2
Leaving the lters out, replace stage 2 and 3 empty lter housings (hand tight) onto unit.
Measure & pour either 1/2 cup of hydrogen peroxide or common household bleach into the
1st lter housing (Stage 1) and hand tighten onto unit.
With the RO faucet in the closed position turn on the incoming water supply to the system.
Wait 1 minute for the unit to pressurize. Turn on the RO faucet and let the water run for 30
seconds. Turn off the RO faucet and let the unit rest for 2 minutes. Finally, open the RO faucet
and let the water run for 5 more minutes.
Turn off the incoming water supply to the system. Keep the RO faucet open until the
storage tank is completely drained.
Open the membrane housings and re-install the RO membranes while making sure not to
kink the O-rings. (Refer to “Membrane Replacement” section on page 14 for directions on
installing the membrane). Tighten the caps back on the housings and reconnect white tubing.
Step 7
Remove lter housings Stage 1, 2 & 3 and empty of water.
Before re-installing the lter bowls back on to the system , check O-rings to make sure
they are still in place and lubricate with water soluble lubricant.
Caution:
Insert the new sediment lter (cloth like appearance) into the 1
st
lter housing which is the one
on the water inlet side (green tubing from the adapt-a-valve) of the RO system and
re-install housing.
Step 8
Insert the new Carbon Block lter (White End Caps) into the 2nd and 3rd housing and
re-install housings.
Step 9
Tip:
This is a good time to check the air pressure in your storage tank. For instructions
please see page 15.
Step 10
The nal in-line lter clipped on to the top of the reverse osmosis membrane housing.
Remove it from the holding clips and remove the compression ttings on both ends of the
lter. Install ttings on to new lter and re-connect. (Discard used nal lter after santizing)
Note:
The ow arrow on the nal lter must be pointing towards the RO faucet / away from
the RO storage tank.
Step 11
Follow Start-up procedure on page 11.