Specifications
co n v e r t e d 115 vo l t , 30 am P co n f i g u r a t i o n
co n v e r s i o n i n s t r u c t i o n s
NOTE: An Authorized Solana
®
Spa Technician must perform the conversion.
1. Disconnect power to the spa and access the control box.
2. Locate the program jumpers (JP1 - JP8) at the top right of the control box.
3. Using a pair of needle nose pliers, carefully remove the parked (spare) jumper.
4. Attach parked jumper to JP1 as illustrated below.
A licensed electrician must install the sub-panel (available from your Solana Spa Dealer) to supply
power to the spa. The sub-panel must be placed in sight of the spa, at a minimum distance of 5 feet (1.5 m) away.
15151515
NOTE:
- Jumpers are located in top
right corner of Control Box
labeled P4 “Config Jumpers”
- To Change from fahrenheit to
celsius remove jumper on JP2.
2 Position Power Jumper
must remain on the Terminal
Block to operate 115 VAC
Spa Models
Terminal Block
Power Jumper
Power Jumper Position
See Wiring
Illustration
115 VAC Wiring
(30A Converted)
When Converting to 30 A
Install Jumper on JP1










