Installation guide

WaterWorks ...... AUTOMATIC WATER CONDITIONER
TYPICAL SOLDERED COPPER or CPVC INSTALLATIONS
soft water _ _
hardwater
I _ _ _ hard water to
outside faucets
I
120 Volt
cutlet _
CROSS - OVER
Use if water supply flows from the left.
Include single or 3 - valve bypass.
vHAATR_R- SOFT
W E_TER
FROM J| II TO SOFTENER
SOFTENER [ V INLET
OUTLET
Note: To install with threaded plumbing, buy 1"
adaptors, either sweat solder or compression, to con-
nect to the 1" copper tubes.
1" copper tube (2) *
(2)*
Bypass Valve *
(4)*
INSTALLATION USING 3 - VALVE BYPASS
(BRINE TANK NOT SHOWN)
[J I I 'rJ _==
BypASS,I !!
va,ver
OUTLET
valve
INLET valve
I
for soft water SERVICE:
- Open the inlet and outle
valves,
- Close the bypass valve.
for hard water BYPASS:
- Close the Inlet and outlet
valves.
- Open the bypass valve.
* included with softener - Pipe and
fittings, represented by dash lines,
supplied L installer.
/
clip (2) *
1" copper tube (2) *
o-ring seal (2) *
VALVE
INLET
6