Installation & Assembly
RED FOR HOT
BLUE FOR COLD
H C HC
COMPASS H/C COMPASS C/H FINISH MATCH
Waterstone faucets are designed for 3 dierent faucet positions. Handle
on left, front and right. Your faucet is congured for the most common
installation (see below). To reverse this and have the handle positioned on
the left, connect the hose for cold water to the hot supply and the hose for
hot water to the cold supply. This will maintain the relationship of pulling
the handle for hot water or pushing for cold water.
HANDLE ON LEFT HANDLE IN FRONT HANDLE ON RIGHT
ORIGINAL FACTORY POSITION
MAY HIT BACKSPLASH
NEW ADJUSTED POSITION
CLEARS BACKSPLASH
H C
A
B
C D
A B E
E
G
C D F
F
1. Before connecting supply hoses,
ush supply stops to clear any
debris. Place a bucket underneath
stops and run water for 5 to 10
seconds. Turn water o.
2. Carefully position hot and cold
supplies so they will not interfere
with other hoses.
3. Connect supply hoses (A) to
supply stops (B). DO NOT use teon
tape or plumbers putty. Turn water
back on and check for leaks.
CONNECTING SUPPLY HOSES HANDLE POSITION
OPTIONAL DECORATIVE CAPS
(TRADITIONAL ONLY - 3 INCLUDED)
OPTIONAL HOT COLD INDICATOR RING
(CONTEMPORARY ONLY)
1. To remove, place a small standard screwdriver in
the slot at the bottom of metal ring that surrounds
the handle caps. Gently pry the cap from faucet
handle.
2. To replace, position cap and snap in with thumb.
1. To reverse, or remove Hot and Cold Indicator
Ring, unscrew the metal cap, remove ring and ip.
2. Slide ring back onto handle and screw metal
cap back on.
A
B
E
D
B
F
C
A
COUNTER
OR SINK
1.
2.
3. 4.
Slide washer (D) and thread the
clamp nut (E) onto threaded
shroud. Tighten nut snug to
underside of sink or counter.
Turn faucet to the desired
handle position. Securely
tighten clamp screws (F).
GANTRY
®
PULLDOWN FAUCET INSTALLATION
Using scissors, cut plastic tie
on hose protector tube (A) and
remove.
Fit exible hoses (B, C) through
hole on counter or sink. (No
plumbers putty is required.
O-ring will seal base).




