Specifications

8
Installation Steps and Start-Up Procedures
Check for Leaks
A. Close all faucets.
B. Check all lines and connections for leaks.
If leaks are found
1. Turn off the main water supply.
2. Open a cold water faucet to depressurize the lines.
3. Close the faucet to eliminate any siphoning action.
4. Repair all leaks.
5. Turn on the water supply.
6. Place the bypass in the “service” position to slowly fill the
appliance. (See Figure 7.)
7. Open a cold water faucet to purge air out of the appliance.
8. Close the faucet and recheck for leaks.
Plug in the Transformer
A. Connect the transformer power cord to the back of
the controller. (See Figure 8.)
B. Plug the transformer into an appropriate outlet.(See Figure 9 .)
C. Ensure that the outlet selected is NOT operated by an on/off
switch.
Flush Appliance
A. Open a cold water tap and allow the appliance to flush for
20 minutes or until approximately 72 gallons (273 L) of water
have passed through the appliance per NSF requirements.
B. Verify that water is flowing by checking that the waterMizer
flow indicator on the display is rotating.
Figure 7: Service Position
STEP 8
STEP 9
STEP 10
Figure 8: Connect power cord
Figure 9 : Plugging in Transformer