Troubleshooting guide

1900 Prospect Court • Appleton, WI 54914
Phone: 920-739-9401 • Fax: 920-739-9406
MANUAL REGENERATION
NOTE: For softeners,
if brine tank does not
contain salt, fill with
salt and wait at least
two hours before
regeneration. If you need to initiate a
manual regeneration, either immediately,
or the same night at the preprogrammed
time for regeneration (typically 2:00
AM), complete the following steps.
For Immediate Regeneration:
Press and hold
REGEN until valve motor starts (typically 3 seconds).
For Regeneration the same night:
Press and release
REGEN (notice that flashing “REGEN TODAY” appears).
ERROR
If the display toggles between “Error”
and an error code (i.e. a number),
call a service technician and report
the error code.
BYPASS VALVE OPERATION
To shut off water to the system, position arrow handles as shown in
the bypass operation diagram below. If your valve doesn’t look like
the diagram below, contact your service technician for instructions
on how to shut off water.
NORMAL OPERATION BYPASS OPERATION
ADJUST HARDNESS, DAYS BETWEEN REGENERATION,
OR TIME OF REGENERATION
For initial set-up or
to make adjustments,
please complete
the steps as shown
to the right. Access
this mode by
pressing NEXT
and + button
simultaneously.
NOTE: Hardness
display shows
“-nA-” if used as
a filter. If other
displays do not
appear, refer to
manual.
QUICK REFERENCE GUIDE:
GENERAL OPERATION
When the system is operating,
one of three displays will be
shown: time of day, gallons of
treated water available,
or gallons per minute.
Pressing
NEXT will
toggle between the
three choices.
TO SET TIME OF DAY
In the event of a
prolonged power
outage, time of day
flashes, indicating
that this needs to be
reset. All other
information will be
stored in memory no
matter how long the
power outage. Please
complete the steps
as shown to the right.
To access this mode,
press
SET CLOCK.
1. Accessed by
pressing
SET CLOCK
2. Adjust hours with
+ and buttons,
AM/PM toggles
at 12
3. Press
NEXT
4. Adjust minutes with
+ and buttons
5. Press NEXT to
complete and return
to normal operation
1. Accessed by pressing
NEXT and + button
simultaneously
2. Adjust hardness
using + and
buttons
3. Press
NEXT
4. Adjust days between
regenerations using
+ and buttons
5. Press NEXT
6. Adjust time of
regeneration hour
with + and
buttons, AM/PM
toggles at 12.
7. Press NEXT
8. Adjust time of
regeneration minutes
with + and
buttons
9. Press NEXT to
complete and return
to normal operation.
© 2011 Water-Right, Inc. All rights reserved.
LIT-IM/IMP Man ROPU 10/11 3M