Operating instructions

6
6
2400
Mechanical installation
Place wide steel shims on the concrete
foundation over the bolts.
Lift the machine and lower it in position. Never
use the door or the door handle to lift or lower
the machine.
Check that the machine is level front-to-rear
and side-to-side and standing firmly on the ten
supporting points. Spacing washers must be
mounted if one or more of these points is not
resting against the floor/foundation.
Place flat washers over the foundation bolts
and secure the machine in position by
tightening the self-locking nuts, with a torque of
20 kpm.
Torque for the nuts (M16) should be 145 ft lbs.
Tighten the nuts in sequence as shown.
Check and tighten the nuts every week for the
first month.
Installation
Fig.
6
Fig.
8
Fig.
9
Fig.
7
8
2402
9
2399
7
2401