Operating instructions
6
6
2400
Mechanical installation
• Place wide steel shims on the concrete
foundation over the bolts.
• Lift the machine and lower it in position. Never
use the door or the door handle to lift or lower
the machine.
• Check that the machine is level front-to-rear
and side-to-side and standing firmly on the ten
supporting points. Spacing washers must be
mounted if one or more of these points is not
resting against the floor/foundation.
• Place flat washers over the foundation bolts
and secure the machine in position by
tightening the self-locking nuts, with a torque of
20 kpm.
Torque for the nuts (M16) should be 145 ft lbs.
• Tighten the nuts in sequence as shown.
• Check and tighten the nuts every week for the
first month.
Installation
Fig.
6
Fig.
8
Fig.
9
Fig.
7
8
2402
9
2399
7
2401