Operating instructions
35
Card programming
54
Instructions for programming
• The program begins with step 0. Program the
step before 0 in the same way as 0 to ensure
a correct program start even though the card
may be pushed too far into the controls.
• Program times
- Each step in the program corresponds to
30 seconds.
- The time for heating and filling with water
shall not be included in the program time.
This also applies when water is added for
cool down (rib P). The program control
motor is stationary during these phases.
• Extraction
- After the extraction has been in progress
for about 70 seconds, the machine
automatically changes to low speed
extraction and then after 60 seconds go up
to high speed extraction unless the LOW
SPEED EXTRACTION switch is pressed
in.
- The drum should be filled with water to high
level before draining and extraction starts.
This is to ensure that the wash is effectively
distributed around the drum.
- Drain (rib D) must be programmed to last at
least one minute (two program steps)
before the extraction starts.
- Drain shall be programmed during the
entire extraction time and for at least
2,5 min afterward.
• Drain
- The machine always operates at distribu-
tion speed when drain is in operation
(rib K).
0343
56
0345
55
0344
30 sec.
High level
Drain
< 1 min
Extraction
Fig.
54
Fig.
55
Fig.
56