Operating instructions

5
2
3
4
1247
1248
1249
Installation
Installation
The machine is delivered with expansion bolts
and other items packed inside the drum.
Shipping securities
The machine is shipped with four large metal
brackets bolted to the suspension legs, as well
as a support between the pulley and the back
plate.
Prior to installation, follow these steps:
Unpack the machine.
Remove the lower front panel and the two rear
panels.
Remove the support from the pulley at the
back of the machine.
Remove both front brackets.
Remove both rear brackets.
Placement
The machine should be installed close to a floor
drain or open drain to make installation, use and
service easier.
The following clearances are recommended for
ease of installation and service:
At least 20 inches between the machine and
the wall behind it.
At least 2 inches on each side.
The floor must be able to support a static load of
790 lbs for the EX-12 FC and 1440 lbs for the
EX-22 FC.
The maximum impact load at extraction is 260
lbs force for the EX-12 FC and 480 lbs for the
EX-22 FC
Fig.
2
Fig.
3
Fig.
4