Instructions / Assembly

8
Ensure that the subfloor is smooth, dry and free from dust. Visually check that there are no
objects on the floor that might damage the heating mat.
Where necessary, an appropriate smoothing compound should be applied and allowed to cure.
If the cable is being fitted to a solid floor it is essential that the concrete slab has been allowed
to cure.
If using the Warmup insulation boards use a suitable cement based adhesive or screws to fix
boards to the subfloor as per the instructions.
If installing in a wet room ensure a slope in the mortar bed is maintained in order to direct
water to the drain pipe.
You are now ready to lay the heating mat.
Anti-fracture Membrane
Warmup heating mats are to be installed under plastic anti-fracture membranes provided the
mat and cable are covered with a suitable thin-set. Always consult the membrane manufacturer´s
specifications before installing any products.
Subfloor Preparation