Instructions / Assembly

5
Quick Install Guide
Channel a groove in the
membrane and subfloor for
the coldtail & termination
joints, enabling them to
fit flush with the top of the
membrane. DO NOT tape over
these joints!
Install the floor sensor
centrally between two runs of
the heater.
Lay the tiles or levelling
compound over the system
The heater, including its joints,
must be wholly within the
thinset or levelling compound
and not exposed.
Use flexible grout when
grouting.
Install the heating cable at the
chosen spacing.
Maintain a minimum 2 peg (2
3
/
8
”) perimeter spacing.
Test the resistance of the
heating cable aer installation
and check against the
previous value to ensure no
damage has occurred.
Test the resistance of the
heating cable aer tiling and
check against previous values
to ensure no damage has
occurred.
6
8
10 11
7
9
Connect your Warmup
thermostat.