Instructions / Assembly
19
Step 4 -
Lay DCM-PRO Membrane
• Measure and cut a length of
membrane to suit your room
using a utility knife and/or
scissors.
• If installing DCM-PRO Peel
and Stick membrane, position
the membrane and remove
the backing from one edge/
corner and stick in position
before removing the rest of
the backing.
• Mark out the floor with a
permanent marker showing
where fixtures and other
unheated areas are going to
be.
• Repeat previous steps for
subsequent runs of the
membrane, butting the runs
of membrane together tightly
until the floor area is covered,
making sure to align the pegs
between membrane runs.
• Protect the membrane with
walking boards in areas of
high foot traic and under
heavy loads.
4
3
1
• If installing DCM-PRO Fleece
membrane apply a thinset
layer to the substrate using a
¼” x ¼” square notch trowel.
• Position the membrane, fleece
side down into the thinset.
• Embed the membrane into
the thinset using a float/roller
removing any air pockets.
2A
2B