Installation Guide
4
Quick Install Guide
Quick Install Guide - The full installation instructions in this
manual must be followed.
• Ensure the subfloor is smooth,
dry and free from dust.
• We recommend installing
Warmup insulation boards for
optimum performance.
• Install perimeter strip around
the perimeter of the room
to allow for dierential
movement between finished
floor level and walls.
• If installing DCM-PRO Peel
and Stick membrane an
appropriate smoothing or
levelling compound should be
applied to coarse surfaces.
• Cut membrane to size, peel
o backing and tack in place
pressing down once aligned.
• Lay additional sheets as above
ensuring that the pegs are
aligned.
• Test the resistance of the
heater ensuring it is within the
range set out in the Reference
Resistance Band table.
• Make electrical provision for
the heater (4
“ x 4” x 2
3
/
4
”
deep
UL/cUL certified electrical
back boxes, conduit).
• If installing DCM-PRO Fleece
membrane apply a thinset
layer to the substrate using a
¼” x ¼” square notch trowel.
• Cut the membrane to size and
press into the thinset using a
float or roller, removing any air
pockets.
• Lay additional sheets as above
ensuring that the pegs are
aligned.
1
4A
3
2
4B
5