Installation Guide

4
Quick Install Guide
Quick Install Guide - The full installation instructions in this
manual must be followed.
Ensure the subfloor is smooth,
dry and free from dust.
We recommend installing
Warmup insulation boards for
optimum performance.
Install perimeter strip around
the perimeter of the room
to allow for dierential
movement between finished
floor level and walls.
If installing DCM-PRO Peel
and Stick membrane an
appropriate smoothing or
levelling compound should be
applied to coarse surfaces.
Cut membrane to size, peel
o backing and tack in place
pressing down once aligned.
Lay additional sheets as above
ensuring that the pegs are
aligned.
Test the resistance of the
heater ensuring it is within the
range set out in the Reference
Resistance Band table.
Make electrical provision for
the heater (4
“ x 4” x 2
3
/
4
deep
UL/cUL certified electrical
back boxes, conduit).
If installing DCM-PRO Fleece
membrane apply a thinset
layer to the substrate using a
¼” x ¼” square notch trowel.
Cut the membrane to size and
press into the thinset using a
float or roller, removing any air
pockets.
Lay additional sheets as above
ensuring that the pegs are
aligned.
1
4A
3
2
4B
5