Installation Guide

STEP 9: ELECTRICAL POWER HOOK-UP
When required by local codes, use a licensed and qualied electrician to
perform the system’s nal electrical hook-up.
Note: Always connect the system to a dedicated, GFCI protected,
Circuit.
STEP 10: SYSTEM OPERATION
Before operating a new oor warming system, wait until the thinset cement
used to lay the tile or stone oor has fully cured to the manufacturer’s
specications (usually 2 to 14 days). Failure to do so can affect the
thinset’s curing process, causing it to become brittle and weakening its
bonding characteristics.
Note: The timer can be “on” a maximum of 8 hours in any 24-hour
period. Do not exceed more than 4 hours during any single use.
STEP 11: WARRANTY REGISTRATION
Your new WarmlyYours oor warming system comes with a standard
warranty and lifetime technical support. See pages 14 &15 for entire
warranty.
To activate your warranty, promptly ll out your warranty registration
on-line at www.warmlyyours.com/h/warranty-register/.
7