User guide

Installation and Operation
SECTION 5
5.5 Installation of TempZone™ Floor Heating Cable (Twin)
5.5.1 Install TempZone™ Cable Fixing Strips
InstallCableFixingStripsinadirectionperpendiculartothedirectionthecablewillrun.CableFixingStripsshouldbe
installedatleast3inchesfromthewallperimeter.WarmlyYoursrecommendssecuringthecabletotheoorevery20
inchesusingtapeorhotgluetokeepthecableinpositionuntiltheself-levelingunderlaymentisapplied.Whenworking
aroundcabinetsorvanities,installtheCableFixingStripsatadistancethatwillallowthecabletobeinstalled1-1/2inches
awayfromthecabinetorvanitybase.
EachrowofCableFixingStripsshouldbepositionedattheappropriateintervalstoensurethedesiredOCspacing(3or4
inches)fortheinstallation.
SecuretheCableFixingStripstotheoor.Thereareseveralacceptablemethodsfordoingso.
For plywood, cement board, or similar surfaces:
•SecureCableFixingStripwithgalvanizednailsorscrews.
For concrete or similar surfaces:
•Concretenailsarerecommendedforbestresults.
•Double-sidedtape,hotglue,orastrongsprayadhesivemaybeusediftheooristhoroughlycleanedandtheCable
FixingStripsarecleanedtoremoveanyoils.
•Ifsprayadhesiveisused,besuretocarefullyfollowallofthemanufacturersinstructions.WarmlyYoursrecommends
applyingthesprayadhesivetoboththebackoftheCableFixingStripandtheoor.
Nail
Screw
14
Figure 6. Securing the Cable Fixing Strips