Installation Guide
1.Weavethecablebackandforthacrosstheareaatthedesired
spacing.Maintainslighttensiononthecabletoensureitdoes
notpullloose.Ifdesired,usehotglueatintervalstohelp
ensureitstayssecure.NEVERspacethecableslessthan3”apart.
2.Markwherethefactorysplicewillbeplaced.Cutthemattingor
membraneandinsertsplice.Itmaybenecessarytosecurethe
splicetotheoorwithhotglue,adhesiveorthinset.
3.Embedtheheatingcablebetweenstuds,ataspacingof3
studs.Closerspacingmayresultinoverheatinganddamageto
buildingstructures.Awiderspacingmaynotprovidesufcient
powertowarmtheoor.
4.Cablemustbeturnedorau-shaped“jog”createdatevery10ft
(3m)ofcablerun.
5.Alwaysremembertoinstallthethermostatsensor(ifapplicable)
6”intoanopenloopoftheheatingwire.Cutintomembraneas
shown.
Installation and Operation
SECTION 5
17
3” Spacing
RPM Mats
3.5” Spacing
Schluter Ditra-Heat (3.5”)
or Prodeso Mats (3.75”) Spacing