Full Product Manual

1. Weave the cable back and forth across the area at the
desired spacing. Maintain slight tension on the cable to
ensure it does not pull loose. If desired, use hot glue at
intervals to help ensure it stays secure. NEVER space the
cables less than 3” apart.
2. Mark where the factory splice will be placed. Cut the
matting or membrane and insert splice. It may be necessary
to secure the splice to the floor with hot glue, adhesive or
thinset.
3. Embed the heating cable between studs, at a spacing
of 3 studs. Closer spacing may result in overheating and
damage to building structures. A wider spacing may not
provide sucient power to warm the floor.
4. Continue to lay out the cable until the cable end cap is
reached. Mark final location of end cap. Cut the matting or
membrane and insert the end cap. It may be necessary to
secure the end cap to the floor with hot glue, adhesive or
thinset.
5. Always remember to install the thermostat sensor (if
applicable) 6” into an open loop of the heating wire. Cut into
membrane as shown.
Installation and Operation
SECTION 5
15
3” Spacing
RPM Mats
3.5” Spacing
Schluter Ditra-Heat (3.5”)
or Prodeso Mats (3.75”) Spacing