Installation Instructions
2.2
PLAN CABLE ROUTING
z Before installing cable, ensure that all surfaces on which the Heating Cable will lie are free of any sharp edges, debris or other restric-
tions that may cut or otherwise damage the heating cable.
z Carefully measure and locate the mid-point of the Heated Area (NOTE: This may differ from the linear mid-point from one end of the
room to the other). This will be a useful reference line later, as it should coincide with the "Half of Cable Marker". Using a chalk line or
a heavy-tip marker, straight edge and square, mark the ‘half of heated area’ line. (Figure 3a)
z Planthecablelayoutontheoor.Itmaybehelpfultooutlinethecablepathonthesub-oorusingasuitablemarker. (Figure 3b)
z Carefully consider the location of Low Trafc Areas.
z AllowsufcientspacealongwallsandcabinetsfortheheatingcableStart of Run. Heating cable should be within 1
1
/
2
" of any vanity kick
plate. The Border Dimension may vary between 1
1
/
2
" to 6" depending on the cable coverage range and the size of your room (refer to
the section, "Considerations for Installation", in the DFT Cable Guide.
z To simplify mortar trowelling later, consider installing cable runs parallel to the longest wall in the room.
Figure 3b
Figure 3a










