Installation & Assembly

STEP 5
STEP 4
STEP 3
Set Roof on Top of Hutch.
Align Hinges and Attach 4- 3/4" Bolts.
Install “Stop Chain” as Shown Below
using 1- 3/4" Bolt.
Slide Pan in Front Below Floor on Pan Rails. Assembly is Now Complete!
Tip: This item
(as any wood)
should be peri-
odically (every
12 to 18 months
depending on
climate) treated
with a non-toxic
exterior grade
stain.
Slide Floor into Bottom of Hutch, Wire
Side Up. Align Side Holes and Fasten
Back Panel (D) to Side Panels using
6- 1 1/2" Bolts and 6- Wing Nuts.
FLOOR
Wing Nuts should face into the Hutch.
3/4" Bolt 3/4" Bolt
If you have any questions or concerns about this product, contact our customer service
department at 1-800-295-2243 or cs@waremgfinc.com and we will help you with any problems,
Mon-Fri 8:00-4:00 MST