Operation Manual

26
Gastype A (min.-max.) B (min. - max.) Collar shaft Gastype A (min. - max) Collar shaft
Nat. gas
LPG
Butane
1,0 - 3,0 m 0 - 0,5 m Ø 70 mm
Ø 80 mm
Ø 80 mm
Nat. gas
LPG
Butane
5,0 - 10,0 m Ø 50 mm
Ø 50 mm
Ø 50 mm
Nat. gas
LPG
Butane
1,2 - 3,0 m 1,0 - 3,0 m NO
NO
NO
Nat. gas
LPG
Butane
1,0 - 5,0 m Ø 70 mm
Ø 70 mm
Ø 70 mm
all dimensions are exclusive the length of the wall outlet all dimensions are exclusive the length of the roof outlet
Gastype B (min. -
max.)
A1 (min. -
max.)
A1 + A2
(min. - max.)
Collar
shaft
Nat. gas
LPG
Butane
1 - 3 m 1 - 10 m 1 - 10 m NO
NO
NO
(A1 + A2 : B) : 1 Proportion vertical: horizontal (or 45
o
up)
is always at least 2 : 1
all dimensions are exclusive the length of the roof outlet
Wall outlet
t Always allow one metre vertical before passing through the outer wall.
t The maximum length for a horizontal segment is 3 metres.
t Determine the location of the appliance and the exterior wall duct.
t Make an opening of Ø 160 mm for the wall duct.
t Connect the wall duct vertically with a curve to the mouth of the appliance, push them rmly together and
place the clip binding. The blue rubber ring ensures sucient sealing of the outlet of the ue gas system.
t If the appliance is placed more than 1 meter from the outside wall, place the rst meter on top the appli-
ance, then the elbow followed by the wall outlet. Finally make sure the construction is gastight.
A
A
B
A1
A2
B