operation manual

WP2-8_GB 40 / 192
1. IMPORTANT GENERAL INSTRUCTIONS
The installation and operation of the heating equipment shall comply with all the instruc-
tions of the manufacturer, the European standards and the standards of the country
where the furnace is installed and operated. This is how malfunctioning and operating faults
can be forestalled.
Before the commissioning of the boiler, the operator of the boiler is obliged to consult
the instructions to become familiarized with the particular properties of the heating
equipment and the appropriate fuels.
The pellet furnace can be operated only with wood pellet of natural conditions (6 mm Ø) as
defined in standard EN-PLUS A1, DINplus or Ö-Norm M7135. Never use any shredded wood
or other fuels, waste materials.
In Europe, European Standard EN 13384 pertains to chimneys, EN 15287 to flue exhaust
equipment and EN 1856-2 to connecting elements.
Furthermore, in Germany the following requirements are also valid: Decree on heating
(Feuerungsverordnung (FeuVO), Provincial decrees on construction, Electricity/VDE
guidelines ( Elektro - / VDE-Richtlinien ) and Professional regulations on heating and air
heating. Besides, Federal Emission Protection Decree 1 (1. Bundes-Immissionsschutz-
Verordnung (1. BImSchV) also needs to be observed. Before commissioning, the specific lo-
cations of heating have to be accepted by the competent chimney-sweeper. The associated
protocol of acceptance shall represent the commissioning permit.
When the appliances is operated jointly with any air engineering equipment (for instance ventila-
tion equipment, vapour exhauster, pneumatic conveyor, etc.) the relevant technical rules / re-
quirements (in Germany, among others, ventilation and heating can be combined only are
permitted in Article 4 of FeuVO) shall be observed.
Hereunder, the requirements associated with use for the intended functions are dis-
cussed.
All the other applications are deemed as use beyond the intended functions. We cannot assume
liability for any related damage. Use in line with the intended functions involves the proper ob-
servance of the operating and installation instructions. Any unauthorized intervention and modi-
fication on the equipment may result in the invalidation of warranty and guarantee demands.
Any work on the appliance, especially installation, repairs, first commissioning, servicing
and corrections may be carried out solely by professional contractors (heating engineering
and air heating contractors). Any unprofessional intervention may lead to the invalidation of the
warranty and guarantee. Electrical appliances may be connected and serviced only by electri-
cians. Electronic structural elements, including, without limitations, printed circuit boards and
operating boards are electrostatically sensitive.
Within the framework of ultimate delivery, the professional contractor is obliged to train the
operator thoroughly and professionally in operating, cleaning and maintaining the equipment.
Particular attention shall be paid to the use of appropriate fuels, regular cleaning to be per-
formed by the operator, the necessary maintenance, as well as compliance with the safety re-
quirements. It is especially important to emphasize that any non-observance of the instructions,
or the failure to perform the prescribed cleaning and maintenance operations may result in the
invalidation of the warranty and guarantee.
Before commissioning, it shall always be ensured that all the accessories have been removed
from the combustion chamber and ash compartment, while the pellet storage space should
not hold any residual material.