Instructions / Assembly
WWW.WAMBAMFENCE.COM
8
ASSEMBLY
INSTRUCTIONS
BL19103
STEP 3:
INSTALL BRACKETS AND BOTTOM RAILS
Note: Ground can be dug out about 3” to
4” to allow post booms to sit below the
ground if necessary.
to compensate for a crooked pipe
anchor.
Install (1) Bracket (F) on post
Screws (H).
Place second bracket over the opposite end
of the Horizontal Rail (C), and slide the rail
down into the bracket on the opposing side.
Note: There could be a slight conict between
the head of the exposed screw and the end of the
rail in a ght ng applicaon. The end of the rail
can be notched to accommodate.
Slide Posts (B) down over donuts.
STEP 2.4
STEP 3.1
STEP 3.2
STEP 2.5
B
F
C
H
2”