Install Manual
WALLENSTEIN by EMB Mfg.Z97562 BX52S 3PH AssyManual.120615
Rev # 230615Page 7 of 8
For threaded parts installation, refer to the torque charts in this manual.
Spacer Ring
Hood Capture Ring
Weldment, Discharge Chute
Spacer Ring
Hood Capture Ring
Weldment, Discharge Chute
13. Release the spring latch pin and carefully fold open the hopper, engage the spring latch to lock the
hopper into open position.
14. Insert and fasten the remaining nut and bolt for the hopper.
15. Chute assembly:
• Removethespacerandcaptureringsfromthechuteange:removetheremaining4xnutsand
bolts and put them with the other chute hardware (you should have 8 sets of nuts & bolts)
• Place the capture ring with the matching ring previously removed
• Take the spacer rings and set them on top of the hood ring.
• With a helper set the discharge chute assembly on top of the spacer rings
• While the helper is holding the chute in position, bolt on the capture rings with the chute nuts &
bolts
• fasten down the nuts & bolts and ensure the chute moves freely and locks into position
@
$
#








