Hardware List A ι二二�) 08x30mm Wooden dowel 10 pcs B 画 015x12mm Cam lock 6 pcs c 通勤 015x9mm Cam lock 8 pcs 06x32mm Cam bolt 14 pcs Handle 2 pcs D E 创立二职B 也乓习 F G 囚郎。 04x22mm Bolt 4 P巳S 自 巨型4x32mm Screw 8 pcs M6x12mm Bolt 而mmrmmmT 皿@ H 4弘 J 哩皿@ K 0 L M N |〉 Plastic wedge 4 pcs 03x17mm Screw 4 pcs 030 Sticker 14 pcs Glue tube 1 pc 06x50mm Bolt 4 P臼 M4 Hex Key Iv 明阻四旺ζ咀 16 pcs pc Philips head screwdriver required for assembly (not included)
Insert dowels (A) into side panles (3)(4) and slat (12). Screw cam bolts (D) into side panels (3,4).
Screw cam bolts (D) into panels (1,9).
Attach side panels (3,4) to the slat (12). Insert cam locks (B) into slat (12) and tighten with a screwdriver.
Use Hex Key (N), screw (M) to secure the bottom panel (2) to the side panels (3,4).
Slide back panel (5) into groove.
Place the top panel (1) to the side panels (3,4). Insert cam locks (B) into side panels (3,4) and tighten with a screwdriver.
Secure the back panel (5) by using the plastic wedge (I) and screw (J).
Use Hex Key (N), bolts (H) to secure legs (6) into bottom panel (2).
Use screw (G) to secure the drawer side panels (7,8) into drawer back panel (10).
Slide drawer bottom panel (11) into groove.
Secure handle (E) with bolts (F) into drawer front panel (9).
Attach drawer front panel (9) to drawer side panels (3,4). Insert cam locks (C) into drawer side panels (3,4) and tighten with a screwdriver.
Place sticker (K) over holes as per diagram.
To insert the assembled drawers inside the unit , tip the front of drawer down and drop the rollers of the drawer slide runners behind the rollers of slide tracks on the unit . Lift the front of the drawer up and slide it into the unit.
To insert the assembled drawers inside the unit , tip the front of drawer down and drop the rollers of the drawer slide runners behind the rollers of slide tracks on the unit . Lift the front of the drawer up and slide it into the unit.