Instruction manual
10
Figure 1: Typical Installation Drawing, Continuous In-line Sampling
HEAT
EXCHANGER
COOLING TOWER
EH
Metering
Pump
(up to 6)
Posiflow
L
e
v
e
l
s
w
i
t
c
h
Makeup cond
Makeup
water
Flowmeter
Bleed
Flowmeter
B
leed
V
alve
pH
Electrode
ORP
Electrode
Flow
switch
Conductivity
electrode
Inhibitor,
Bio1, Bio2,
pH Adjust, ORP Adjust,
or Dispersant
Injection
Valve
F
o
o
t
v
a
l
v
e
Y-strainer
Y-stra
i
n
e
r