operation manual

EN
13
W14/W15/W16
is recommended the unit be place on a hard at board. Ensure the unit will not slip or
tilt. Dust sheets and newspapers are not suitable.
Preparation
Gently score the areas to be stripped using a proprietary perforator
tool or the edge of a wall scraper in a criss-cross pattern.
Operation
Remove ller cap and ll unit with clean water to the MAX level line indicator. Replace
cap (Fig. 1+2).
Screw hose onto threaded outlets of boiler and steamplate, hand-tight is sucient.
Do not overtighten (Fig. 3+4).
Connect supply cord from unit to power socket-outlet and switch on (Fig. 5).
i
When connecting the cordset to the unit, make sure the ap is fully open and
does not prevent the plug being fully inserted. Refer to diagram below.
If the ap touches the ribs on the cordset it may prevent the cordset inserting
fully into the unit.
FlapFlapFlap
Cordset
Cordset
lt can take up to 15 mins (approx.) before steam is produced - depending on ll water
quantity and temperature (Fig. 7).
Do not leave unattended and keep children and pets out of the room.
Just before full steam production a small amount of bubbling and water will occur at
the steamplate.
Beware of hot water discharge prior to steam emission.
Hold the steamplate at against the wallpaper for approx. 10 seconds - from which
the paper should now easily come away using a wallpaper scraper (Fig. 9).
Some papers may need more steam than others. Operate steamer until water level is
low, then unplug unit and allow to cool for at least 2 minutes (Fig. 11).