Full Product Manual
1
PUSH
2
3
k
0
4
A
5
B
0
8
EN
LOAD MATERIAL
i
These steps will prime the system and get it ready
to spray.
www.wagnercontrolpro.com/howtoCP130
YOU WILL NEED
• The material you plan to spray
• Extension cord
• Waste bucket
i
Recommendation: It is good practice to perform
the steps on this page using water to familiarize
yourself with the function of the unit as well as to
ensure the unit is set up properly.
i
Recommendation: Always use new spray
material or material that has been thoroughly
strained. Old material often contains debris that
can clog the system.
At
tention
Take care to prevent material spills. Make sure to
use drop cloths and mask anything that is in the
spraying area and could accidentally be sprayed.
1. Push tab on lter twice to ensure inlet valve operation.
2. Fill the tank with spray material. Pull the return tube from the
tank and hold it over a waste container.
3. Plug in the sprayer.
Turn the PRIME/SPRAY knob to PRIME.
Turn the power ON (l). Do not run the sprayer dry.
4. Allow pump to run until you see spray material owing from the
return tube (A).
5. Turn power OFF (0).
Place return tube back into position over the tank (B).
Replace the tank lid.
i
For consistent color results, add spray material
regularly in order to mix it.
When the tank empties, stop spraying immediately.
Rell the tank and then follow steps 3-5.
At
tention
The tank lid should t snugly over the tank, but it
is not designed to be air- or liquid-tight. Do not tip
the unit when it is lled with spray material.