Operators Manual
Table Of Contents
- 1. Foreword
- 2. Safety information
- 3. Technical data
- 4. Description
- 5. Transport to the worksite
- 6. Operation
- 6.1 Adjusting the handle
- 6.2 Adjusting the guide wheel
- 6.3 Cutting depth setting
- 6.4 Depth of cut indicator
- 6.5 Water tank
- 6.6 Parking brake
- 6.7 Assembling the cutting blade
- 6.8 Disassembling the cutting blade
- 6.9 Checking the motor before starting
- 6.10 Starting the engine
- 6.11 Operating the engine
- 6.12 Turning off the engine
- 7. Maintenance
- 8. Signs
- EC Declaration of Conformity
- DIN EN ISO 9001 Certificate
Wacker Construction Equipment AG – Preußenstraße 41 – 80809 München – Deutschland – Tel.: +49-(0)89-354 02-0 – Fax: +49-(0)89-354 02-390
Wacker Corporation – P.O. Box 9007 – Menomonee Falls, WI 53052-9007 – USA – Tel.: +1(1)262-255-0500 – Fax: +1(1)262-255-0550 – Support: 800-770-0957
Wacker Machinery (HK) Ltd.– Skyline Tower, Suite 2303, 23/F – 39 Wang Kwong Road, Kowloon Bay – Hong Kong – Tel.: +852-3188-5506, Fax: +852-2406-6021