Instructions / Assembly

wc_tx004020gb_FM10.fm
32
Operation PT2 / PT3
4.10 Emergency Shutdown Procedure
Perform the procedure below if a breakdown or accident occurs while the machine
is operating.
1. Stop the engine.
2. Remove the obstruction.
3. Un-kink the hoses.
4. Allow the machine to cool.
5. Contact the rental yard or machine owner.