Product Manual
wc_tx004491en.fm
42
Operation RD12A/12K
6 Operation
6.1 Preparing the Machine for First Use
1. Make sure all loose packaging materials have been removed from the machine.
2. Check the machine and its components for damage. If there is visible damage,
do not operate the machine. Contact your Wacker Neuson dealer immediately
for assistance.
3. Take inventory of all items included with the machine and verify that all loose
components and fasteners are accounted for.
4. Add fluids as needed and applicable, including fuel, engine oil, hydraulic oil,
retardant, and battery acid.
5. Move the machine to its operating location.
6. Connect component parts not already attached.
6.2 Preliminary Checks
Requirements
Machine on a flat, level surface
Before
starting
Before starting the machine, check the following items:
■ Engine coolant level (diesel only)
■ Engine oil level
■ Hydraulic oil level
■ Fuel level
■ Condition of oil cooler and radiator cooling fins
■ Water level in tank
NOTICE: Top off the lubricating and hydraulic oil levels using products with the
grades and specifications shown in the “Lubrication” table found in the Technical
Data chapter of this Operator’s Manual. When doing so, use clean containers,
funnels, etc., to avoid contamination.
Before
operating
Before operating the machine:
■ Check the machine for fluid leaks. Repair them before operating.
■ Unlock the articulated steering joint.
■ Adjust drum scraper position.
■ Check the work area for obstructions. Remove all obstructions.
■ Check that all handles, steps, and platforms are free of dirt, snow, grease, fuel,
or anything else which might endanger operator safety.
■ Allow the engine to warm up according to the following schedule:
* More time may be required if hydraulic controls are sluggish.
Ambient Temperature Time (min.)
Above 0°C (32°F) 5
Below 0°C (32°F) 15*










