Repair manual

General Operation
wc_tx000111gb.fm 36
Preparing for Installation
Before installing the pump at a work site, you will need to have the
following tools and instruments ready:
Insulation resistance tester (megohmmeter)
AC voltmeter
AC ammeter (clamp-on type)
Bolt and nut tighteners
Power supply connection tools (screwdriver or box wrench)
Note: Please also read the instructions that come with each of the test
instruments.
Checks to Make Before Installation
When a three-prong grounded plug is used:
Use the megohmmeter to measure the motor insulation resis-
tance between the grounding prong and each one of the two
power prongs.
When connection wires are used:
With the megohmmeter, measure the insulation resistance
between the ground wire (Green) and each one of the two power
wires.
Reference insulation resistance: 20M or greater
Note: The reference insulation resistance (20M or greater) is the
value when the pump is new or has been repaired. For the reference
value after installation, see Maintenance and Inspection.
Precautions in Installation
When installing the pump, pay close attention to its center of gravity
and weight. If it is not lowered into place correctly, it may fall and be
damaged or cause injury.
When transporting the pump by hand, be sure to employ manpower
commensurate with the weight of the pump. To avoid back injury when
lifting the pump, bend the knees to pick it up rather than bending your
back only.
Do not under any circumstances install or move the pump by
suspending it from the cable assembly. The cable may be damaged,
causing current leakage, shock, or fire.
4.3.1 Avoid dropping the pump or other strong impact. Lift the pump by
holding it firmly with the hands or by attaching a rope or chain to the
lifting handle.
WARNING
CAUTION