Product Manual
wc_tx004430en.fm
38
Machine Setup LTV
4 Machine Setup
4.1 Preparing the Machine for First Use
1. Make sure all loose packaging materials have been removed from the machine.
2. Check the machine and its components for damage. If there is visible damage,
do not operate the machine. Contact your Wacker Neuson dealer immediately
for assistance.
3. Take inventory of all items included with the machine and verify that all loose
components and fasteners are accounted for.
4. Add fluids as needed and applicable, including fuel, engine oil, hydraulic oil,
retardant, and battery acid.
5. Move the machine to its operating location.
6. Connect component parts not already attached.










