Product Manual

ghi_tx001464gb_FM10.fm
63
HI400HD D / HD G Setting up the Burner
6.4 Adjusting the Gas Pressure (G Models)
Prerequisites
Machine is stopped
Hex key set
Yellow Jacket
®
gas pressure test kit (0–15 in. w.c. manometer)
Flat-head screwdriver
Phillips-head screwdriver
Small adjustable wrench
Procedure
1. Verify that the machine is shut down, stopped, and connected to electrical
power (115V 60 Hz).
2. Close the gas valve (a) on the inlet to the gas train.
3. Connect the manometer to the machine.
4. Verify that the supply gas pressure is 15 in. w.c. maximum. Exceeding the
maximum inlet gas pressure may result in gas train component damage.
5. Remove the dust cap (b) on the Maxitrol
®
gas regulator stem.
This procedure continues on the next page.
wc_gr015323
a
wc_gr015324
b