2.1.4 Insulate Circulation Hoses
Any Circulation Hoses exposed to the outdoor elements should be insulated for maximum heat delivery
into work space. Ground Heaters, Inc. recommends wrapping a cut-to-size Red Wave™ Blanket around
exposed Circulation Hoses. Secure the wrapped blankets to minimize air infiltration and heat loss.
Contact your local Ground Heaters Distributor for additional system configuration advice.
2.1.5 Circulation Hose Protection
Do not drive any vehicles or equipment over the Circulation Hoses. If the Hoses must be deployed in
high traffic areas, construct ramps or guards to protect from damage.
HTF may discolor floor surface. Provide extra protection and care to circulation
hoses when floor appearance is critical. Place hoses away from high traffic areas
whenever possible.
2.2 PRE-START UP CHECKS
2.2.1 Positioning
1. Position the Pureheat’s 5-Port On-Board Manifold as close as possible to the space to be heated.
Circulation Hoses can then easily enter and exit the structure.
The Pureheat must be positioned a minimum of 12 ft (3.6 m) from fuel source or
combustible materials.
2. Chock the wheels to prevent accidental rolling.
3. Use the Heavy Duty Jack-Stand to position the machine as level as possible.
2.2.2 Unloading HX200 Heat Xchangers
TM
1. OPEN the Rear Doors and remove the
aluminum Ramp from its storage location
above Xchangers
TM
.
2. Position the Ramp onto the Ramp
Alignment Pins to unload either the left side
or the right side HX200s. (Photo 2-1)
NOTE: Each HX200 Heat Xchanger
TM
is equipped
with wheels and fold-out handles.
3. Position the HX200s inside the building per
your heating plan. (Refer to Appendix C-1,
Pureheat APPLICATION LAYOUTS.)
NOTE: Each HX200 Heat Xchanger
TM
must be
connected to a separate
15 amp. 120 volts
AC 60 Hz electrical circuit. Use 12-3
extension cords of no more than 100 ft (30
m) in length.
4. Momentarily turn the BLOWER Switch ON to test Blower operation then turn the BLOWER Switch