Product Manual
wc_tx003232gb.fm
26
Operation CT 24-4A
4.6 Unfolding Handle
On new machines the pipe handle comes folded with the following components
attached: Twist pitch control (a), Operator Present Lever (b), throttle lever (c),
hinge pin (d), and adjustable lever (e).
To unfold and secure the pipe handle assembly:
1. While holding the hinge pin, unscrew and remove the adjustable lever and metal
washer.
2. Remove the hinge pin.
3. Straighten the pipe handle and re-insert the hinge pin.
4. Replace the metal washer over the threaded end of the hinge pin, and re-install
the adjustable lever.
5. Tighten the adjustable lever to lock the pipe handle in its fully opened position.
wc_gr004384
b
c
d
e
a