Repair manual
Spiders and Gearboxes CRT Repair
wc_tx000583gb.fm 54
6.2 Gearbox Removal and Installation
See Graphic: wc_gr003420 and wc_gr003421
This procedure requires a lift or crane capable of lifting the trowel 562
kgs. (1240 lbs.).
6.2.1 Position the trowel on a flat, level surface large enough for the trowel
and capable of supporting the weight of the trowel.
6.2.2 Pitch the blades so they lie flat.
6.2.3 Disconnect the battery.
Removal:
6.2.4 Preliminary steps for the right-side gearbox:
• Drain the water tank (a).
• Loosen the clamp that secures the water line (b) to the water tank
and remove the water line from the water tank.
• Remove the two bolts (c) located underneath the water tank and
lift the water tank from the frame.
6.2.5 Preliminary steps for the left-side gearbox:
• Close the fuel valve (d). Loosen the clamp and remove the fuel
hose (e) from the fuel tank (f). Catch any fuel that may drip from
the fuel hose with an appropriate container.
• Remove the bolts (g) (and spacers if equipped) located under-
neath the fuel tank and lift the fuel tank from the frame.
6.2.6 Remove the nut from each pitch cable (h) and pull the cable out of the
pitch yoke.
6.2.7 Remove the screws that secure the pitch control assembly (i) and
remove the pitch control assembly.
6.2.8 Disconnect the wiring (j) to the work lights.
wc_gr003420
b
a
f
g
g
c
d
e