Product Manual
11 Operation and use
24 100_0101_op_0013.fm
11 Operation and use
11.1 Prerequisites for operation
11.2 Before commissioning
11.2.1 Inspection before commissioning
Complete the following inspections:
Check all components for damage.
Check to ensure the Quickflex coupling is firmly seated.
Check whether the power supply system or job site electrical distributor has the correct operating
voltage (see nameplate of the machine or the chapter Technical data.
Check whether the power supply system or job site electrical distributor is secured according to the
applicable national standards and guidelines.
11.3 Commissioning
11.3.1 Connect the machine to the electric power supply
WARNING
Improper handling may result in injury or serious material damage.
Read and observe all safety instructions in this operator's manual, see chapter Safety.
WARNING
Leak current due to moisture penetration.
Injury from electric shock.
Use the extension cable in IPx4 design so that the connection link of the plug /
coupling is splash-water protected.
NOTICE
Only use an operational, fully assembled machine - IRflex vibrator head with FUflex
inverter on the construction site!
WARNING
Do not lay supply line in areas of traffic ways.
Damage of the Bodyguard® can lead to short circuit through entering water.
WARNING
Damaged insulation.
Risk of electric shock.
Do not bend or damage the protection hose and power cable.
NOTICE
Only connect the machine to single-phase AC. For connection values, see the chapter
Technical data.
NOTICE
Electrical voltage.
An incorrect voltage can damage the machine.
Check whether the voltage of the power source conforms to the specifications of the
machine. See chapter Technical data.