User`s manual

Goliath Guillotine Pipe Saw Chapter 5: Operating Instructions
E.H. Wachs Company Part No. 98-037-011-MAN, Rev. 3-0906 47
Figure 5-50. Put both clamping levers down at the
same time to engage the clamping drive.
6.
Close both clamping drive levers (up position) at the
same time. The valves will hold pressure on the
clamping drive to keep the saw clamped on the pipe.
Figure 5-51. When the clamping drive is fully
engaged (clamping pressure equals system pressure),
return both clamping levers to the up position.
7.
Slightly lower the crane holding the saw to allow the
clamp to hold the saw’s weight. Leave the crane
attached to the saw.