Installation & Assembly

WAC Lighting
www.waclighting.com
Phone (800) 526.2588 • Fax (800) 526.2585
Headquarters/Eastern Distribution Center
44 Harbor Park Drive • Port Washington, NY 11050
Phone (516) 515.5000 • Fax (516) 515.5050
Western Distribution Center
1750 Archibald Ave • Ontario, CA 91761
Phone (800) 526.2588 • Fax (800) 526.2585
WAC Lighting retains the right to modify the design of our products at any time as part of the company's continuous improvement program. JULY, 2014
INSTALLATION INSTRUCTION
L Track Systems
LT2, LT4, LT6, LT8
LIVE END ELECTRICAL FEED OVER A JUNCTION BOX
1. Make sure power is o.
2. Note the polarity indicator ridge of the track. The live end can only be installed on one end. Brace the track end cap
(opposite the live end) against a solid surface, and insert live end. This is important to achieve good electrical contact.
3. Position live end over center of junction box. Mark track-mounting holes.
4. Remove live end cover and pry out the knock out hole.
5. Use a canopy plate CP”. Attach mounting plate to junction box. Note plate has threaded screw holes, the remaining
screw will t in a slotted hole to permit positioning. The plate will protrude slightly beyond the junction box,
but will be covered when completed.
6. Connect neutral (white) wire to the silver screw terminal on the live end marked “N” and Hot (black) wires
to the brass colored screw terminal marked A on the live end.
7. Connect Ground wire to green wire or screw terminal on the live end. Tuck any excess wire back into the junction box.
8. Replace live end cover and secure with screw.
LIVE END ELECTRICAL FEED OVER A JUNCTION BOX
1. Raise track assembly to ceiling. Mark mounting hole
locations. Track support points should be not more than
4’ apart. Use a minimum of two support points for 2’ and
4’ track and three for 6’and 8’ track.
2. Drill ceiling holes suitable for the fasteners you intend to
use. Toggle wings (supplied) require ½ inch holes.
3. If additional holes in track are needed, drill 5/32” holes
through the centerline of track (locate holes at least 6” in
from track ends).
4. Insert bolts through track, and into the toggle wings,
tighten 2 or 3 turns.
5. Push toggle wings into ceiling holes. Do not fully tighten
toggle bolts until all electrical connections are made.