User's Manual
Vyyo Installation Guide
www.vyyo.com
WMTS US Port Mapping – p. 118
9.2.3 Checking the Upstream
Perform the following to isolate a problem on the upstream channel of the RF
frontend:
Measure the output power of the downconverter. Use a spectrum
analyzer tuned to the upstream channel IF (about 44 MHz), with a span of
20 MHz.
The following diagram illustrates a basic RF test setup.
Antenna
Coaxial Cable
Power Combiner
Downconverter
Tx Upconverter
and Power Amp
WMTS
Coaxial Cable
Coaxial Cable
Coaxial Cable
Antenna
Cable Modem
Coaxial Cable
Customer Equipment
100BaseT
Switched Hub
NMS Station and
IP Servers
100BaseT
Coaxial Cable
LNA
Filter
Cable Plant
Internet Router
Figure 9-1: Basic RF Setup