User Manual
Table Of Contents
- Human Exposure Compliance 1
- Introduction 1
- System Description 2
- Wireless Messaging System Overview
- FLEX, ReFLEX, and InFLEXion Messaging Protocol Overview
- RFO! Transmitter Functional Description
- RFO! Paging Station Options
- Hardware Options
- Software Options
- Network Peripheral Options (Option X267)
- RF-Baton! Transmitter Controller without GPS Receiver (Option X594)
- RFB! Transmitter Controller with GPS Receiver (Option X179)
- Battery Revert (Option X649)
- RFO! Transmitter Peripheral Options (Option X263)
- RFA! Receiver (Option X349, X351, X352, X353)
- RFA! Receiver Peripheral Package (Option X88, X89)
- Equipment Specifications
- Electrical Requirements
- Preinstallation 3
- Installation 4
- Operation 5
- Establishing an RF-O! FIPS Session
- Reset and Initialization
- Operation Modes
- Alarm and Error Logs
- General Operational Setup and First Time Use
- RF-O! Paging Station Parameters
- RF-O! Power Control
- Power Metering
- Wattmeter Calibration
- Amplitude Alignment
- Power Set
- Module Monitoring
- Power Cutback/Shutdown
- Power Leveling
- Alarm Reporting
- Subchannel Configuration Control
- Power Amplifier Configuration Control
- Carrier Feedthrough Nulling
- RF-O! Ambient Temperature Monitoring
- High Ambient Temperature Cutback/Shutdown Operation
- High PA vs. Ambient Temperature Cutback/Shutdown Operation
- Maintenance 6
- Troubleshooting
- Check Front Panel Indications
- Verify Data from the RFB! Transmitter Controller
- RFO! Transmitter Status
- Power Cutback LED is Blinking
- Power Cutback LED is Continuously Illuminated
- Check for Plug-and-Play Errors
- Check Control Data Received by the RFO! Transmitter
- Check RF Power Path
- Check Transmitter Frequency
- Check RF-A! Receiver Functionality
- Pages Not Received
- Voice Quality Diagnostics
- Removal and Replacement
- Cabinet Doors Removal
- Cabinet Doors Replacement
- DC-DC Converter Removal
- DC-DC Converter Installation
- Orchestra Control Board Removal
- Orchestra Control Board Installation
- Exciter Removal
- Exciter Installation
- Power Amplifier Removal
- Power Amplifier Installation
- Power Supply Removal
- Power Supply Installation
- Wattmeter (Power Detector) Removal
- Wattmeter (Power Detector) Installation
- Battery Removal
- Battery Installation
- AC Distribution Panel Removal
- AC Distribution Panel Installation
- RFO! Transmitter Backplane Removal
- RFO! Transmitter Backplane Installation
- RF-A! Receiver Removal and Replacement
- RFB! Transmitter Controller Removal and Replacement
- Resetting the Parameter Database
- Paging Station Alignment
- Temperature Calibration Procedure
- Software Download
- Troubleshooting
- Abbreviations and Acronyms A
- Backplane Connectors B
- Model and Options Charts C
- FIPS Action Commands (ver 2.0.0) D
- FIPS Read/Write Commands (ver.2.0.0) E
- Alarms and Error Messages F
- Transmitter Alignment Checklist G
- Debug Traces H
Contents RF-Orchestra!™ Transmitter Installation and Operation
xxviii 6880493G02-C July 2000
Carrier Feedthrough Nulling, 5-31
RF-O! Ambient Temperature Monitoring, 5-35
High Ambient Temperature Cutback/Shutdown Operation, 5-35
High PA vs. Ambient Temperature Cutback/Shutdown Operation, 5-37
Maintenance, 6-1
Troubleshooting, 6-2
Check Front Panel Indications, 6-3
Verify Data from the RF-B! Transmitter Controller, 6-4
RF-O! Transmitter Status, 6-4
Power Cutback LED is Blinking, 6-10
Power Cutback LED is Continuously Illuminated, 6-11
Check for Plug-and-Play Errors, 6-11
Check Control Data Received by the RF-O! Transmitter, 6-12
Check RF Power Path, 6-15
Check Transmitter Frequency, 6-21
Check RF-A! Receiver Functionality, 6-22
Pages Not Received, 6-22
Voice Quality Diagnostics, 6-26
Removal and Replacement, 6-28
Cabinet Doors Removal, 6-28
Cabinet Doors Replacement, 6-28
DC-DC Converter Removal, 6-29
DC-DC Converter Installation, 6-30
Orchestra Control Board Removal, 6-30
Orchestra Control Board Installation, 6-31
Exciter Removal, 6-31
Exciter Installation, 6-32
Power Amplifier Removal, 6-33
Power Amplifier Installation, 6-35
Power Supply Removal, 6-36
Power Supply Installation, 6-37
Wattmeter (Power Detector) Removal, 6-39
Wattmeter (Power Detector) Installation, 6-40
Battery Removal, 6-40
Battery Installation, 6-44
AC Distribution Panel Removal, 6-45
AC Distribution Panel Installation, 6-45
RF-O! Transmitter Backplane Removal, 6-46
RF-O! Transmitter Backplane Installation, 6-48
RF-A! Receiver Removal and Replacement, 6-49
RF-B! Transmitter Controller Removal and Replacement, 6-49